Challenge
This was a large job with 20 Sunrise new double hung windows. It was challenging as it was a winter installation (as you can see from the photo) and with a holiday schedules to work around, this job required a lot of coordination.
Solution
A majority of the coordination came in an organized front office between the project manager and the crew. We worked on the first floor first and moved to second floor as schedules allowed. We timed everything and communicated openly with the homeowners for a smooth and happy installation.